        What to check before the soft starter is powered on?

        2023-05-20 11:27:04

        Soft starter is a novel motor control device that integrates motor soft start, soft stop, light load energy saving and multiple protection functions. It is called Soft Starter abroad. The domestic soft starter is the most famous Heping hps2 series soft starter. Its main composition is a three-phase parallel thyristor and its electronic control circuit connected in series between the power supply and the controlled motor.


        The soft starter we use needs to be powered on. Generally, we need to check before power on before use. Let's take a look with the editors below to see which ones to check:


        First, check the wiring


        1. Check whether the wiring is correctly connected in accordance with the requirements of the product instruction manual, especially pay attention not to connect the output terminals (U, V, W) to the three-phase power supply.


        2. Check whether the installation is normal and whether the grounding is correct and reliable. Especially for the control circuit wiring (such as the given signal line and feedback signal line on the input side, the frequency signal line and current signal line on the output side, the switch signal control line, etc.), it is necessary to keep away from the main circuit (more than 100mm) and shield Anti-interference measures. The shield of the cable should be connected to the common end (COM) of the control circuit near the inverter. Do not connect to the ground (PE) of the inverter. The other end of the shield should be suspended.


        3. Check whether the brake unit wiring is correct. When connecting an external braking resistor (some inverters have a built-in braking resistor, when the capacity is insufficient, an external braking resistor is required), first remove the wiring of the built-in braking resistor from the P (+) and DBd terminals, and The wire end is insulated, and then the external braking resistor is connected to P (+) and DB. It is required that the wiring length is less than 5M, and twisted pairs are used.


        4. Check whether the DC reactor wiring is correct. Note: Short-circuit conductors are connected to the connection terminals P1 and P (+) when leaving the factory. When using a DC reactor, this short-circuit conductor should be removed; if a DC reactor is not used, the short-circuit conductor can be connected at both ends of the reactor.


        2. Check AC power. For three-phase inverters, the three-phase AC power supply voltage should be within the allowable range (such as 340-440v). Overvoltage and undervoltage are strictly prohibited.


        Third, check the motor


        1. Use a 500V-1000V megohmmeter to measure the insulation resistance of the motor winding to the shell, which should not be less than 5 megohms. If the insulation resistance is less than 2 megohms or the winding has been in contact with the shell, it is strictly prohibited to use the inverter. Otherwise, the inverter will be damaged.


        2. Measure the DC resistance between the three windings of the motor, which should be balanced in three phases, and the resistance between the windings of each phase is ohms. If the resistance is too small or zero, it means that there is a short circuit in the motor winding, and it is strictly forbidden to use it.


        In general, when we check the power of the soft starter, we also need to pay attention to the above points to reduce failures due to power problems during use.


        通用變頻器


        label

        QR code

        The public,

        Mobile station
        The public, Mobile station

        Contact

        未標題-8.png 0755-81719517
        未標題-10.png0755-81719530 未標題-11.pngamb@ambition.com.cn
        未標題-12.pngFloor 1, 5 and 6, building 7, lijincheng science and technology industrial park, gongye dong road, longhua new district, shenzhen

        Navigation

        Home          About

        Product      Case

        Solution      Service

        Job      News

        Contact          

        Copyright © Shenzhen Ambition Electronic Co., Ltd Record number:備案號:粵ICP備12045920號
        主站蜘蛛池模板: 亚洲日韩av无码一区二区三区人 | 在线观看国产精品日本不卡网| 久久综合久中文字幕青草| 四虎永久在线精品免费看| 亚洲av日韩av一区久久| 天天爽夜夜爱| 日韩美a一级毛片| 精品无码午夜福利理论片| 亚洲国产精品一区二区久| 亚洲欧美日韩精品久久| 无码AV动漫精品一区二区免费| 18禁无遮挡啪啪无码网站| 男男欧美一区二区| 欧美内射深插日本少妇| 国产蜜臀在线一区二区三区 | 精品日韩亚洲AV无码| 男女爽爽无遮挡午夜视频| 国产精品中文字幕一区| 88国产精品视频一区二区三区| 国产内射XXXXX在线| 亚洲中文字幕无码av永久| 在线看a网站| 亚洲国产精品日韩专区av| 国产精品美女久久久久av爽| 九九热久久只有精品2| 亚洲精品成人7777在线观看| 人妻少妇88久久中文字幕 | 日韩av毛片福利国产福利| 四虎成人精品无码| 国产熟女一区二区三区蜜臀| 国产永久免费高清在线| 任你躁国产自任一区二区三区| 欧美国产综合视频| 无码成人一区二区三区| 国产成人综合色视频精品| 欧美三级韩国三级日本三斤| 公天天吃我奶躁我的在线观看| 亚洲国产精品无码久久电影| 成人av天堂男人资源站| 丁香婷婷色综合激情五月| 亚洲图片自拍偷图区|