1. <sup id="13zgi"></sup>
        少妇撒尿一区二区在线视频 ,免费无码成人AV片在线,亚洲日韩性欧美中文字幕,图片区小说区av区,国产一区二区三区黄色大片,国产精品中文av专线,无码精品人妻一区二区三区中,天堂网av最新版在线看
        Muen
        News

        News

        Enterprise service provider

        location : Home > News > Technical information

        What to check before the soft starter is powered on?

        2023-05-20 11:27:04

        Soft starter is a novel motor control device that integrates motor soft start, soft stop, light load energy saving and multiple protection functions. It is called Soft Starter abroad. The domestic soft starter is the most famous Heping hps2 series soft starter. Its main composition is a three-phase parallel thyristor and its electronic control circuit connected in series between the power supply and the controlled motor.


        The soft starter we use needs to be powered on. Generally, we need to check before power on before use. Let's take a look with the editors below to see which ones to check:


        First, check the wiring


        1. Check whether the wiring is correctly connected in accordance with the requirements of the product instruction manual, especially pay attention not to connect the output terminals (U, V, W) to the three-phase power supply.


        2. Check whether the installation is normal and whether the grounding is correct and reliable. Especially for the control circuit wiring (such as the given signal line and feedback signal line on the input side, the frequency signal line and current signal line on the output side, the switch signal control line, etc.), it is necessary to keep away from the main circuit (more than 100mm) and shield Anti-interference measures. The shield of the cable should be connected to the common end (COM) of the control circuit near the inverter. Do not connect to the ground (PE) of the inverter. The other end of the shield should be suspended.


        3. Check whether the brake unit wiring is correct. When connecting an external braking resistor (some inverters have a built-in braking resistor, when the capacity is insufficient, an external braking resistor is required), first remove the wiring of the built-in braking resistor from the P (+) and DBd terminals, and The wire end is insulated, and then the external braking resistor is connected to P (+) and DB. It is required that the wiring length is less than 5M, and twisted pairs are used.


        4. Check whether the DC reactor wiring is correct. Note: Short-circuit conductors are connected to the connection terminals P1 and P (+) when leaving the factory. When using a DC reactor, this short-circuit conductor should be removed; if a DC reactor is not used, the short-circuit conductor can be connected at both ends of the reactor.


        2. Check AC power. For three-phase inverters, the three-phase AC power supply voltage should be within the allowable range (such as 340-440v). Overvoltage and undervoltage are strictly prohibited.


        Third, check the motor


        1. Use a 500V-1000V megohmmeter to measure the insulation resistance of the motor winding to the shell, which should not be less than 5 megohms. If the insulation resistance is less than 2 megohms or the winding has been in contact with the shell, it is strictly prohibited to use the inverter. Otherwise, the inverter will be damaged.


        2. Measure the DC resistance between the three windings of the motor, which should be balanced in three phases, and the resistance between the windings of each phase is ohms. If the resistance is too small or zero, it means that there is a short circuit in the motor winding, and it is strictly forbidden to use it.


        In general, when we check the power of the soft starter, we also need to pay attention to the above points to reduce failures due to power problems during use.


        通用變頻器


        label

        QR code

        The public,

        Mobile station
        The public, Mobile station

        Contact

        未標題-8.png 0755-81719517
        未標題-10.png0755-81719530 未標題-11.pngamb@ambition.com.cn
        未標題-12.pngFloor 1, 5 and 6, building 7, lijincheng science and technology industrial park, gongye dong road, longhua new district, shenzhen

        Navigation

        Home          About

        Product      Case

        Solution      Service

        Job      News

        Contact          

        Copyright © Shenzhen Ambition Electronic Co., Ltd Record number:備案號:粵ICP備12045920號
        主站蜘蛛池模板: 亚洲国产精品乱码一区二区| 欧美在线一区二区三区精品| 香港三日本三级少妇三级视频| 国产精品午夜福利精品| 少妇人妻中文字幕hd| 白嫩人妻精品一二三四区| 亚洲精品视频免费| 精品人妻免费看一区二区三区| 欧美白妞大战非洲大炮| 亚洲日韩精品无码av海量| 国产精品中文字幕免费| 亚洲尹人九九大色香蕉网站| 午夜福利看片在线观看| 国产乱人伦偷精品视频不卡| 国产精品一区二区三区三级| 一区二区丝袜美腿视频| 在线观看潮喷失禁大喷水无码| 国产精品亚洲一区二区三区| 99福利一区二区视频| 国产鲁鲁视频在线观看| 一本大道一卡二大卡三卡免费| 亚洲色一色噜一噜噜噜| 国产人碰人摸人爱视频| 丰满少妇内射一区| 久久人人97超碰a片精品| 精品一区二区三区日韩版| 69久久国产露脸精品国产| 四虎永久在线精品免费看| 欧美人人妻人人澡人人尤物 | 亚洲AV日韩AV激情亚洲| 亚洲国产精品线观看不卡| 亚洲欧美综合中文| 高清国产av一区二区三区| 色窝窝免费一区二区三区| 丝袜美腿亚洲综合在线观看视频| 久久久久国产精品人妻电影| 亚洲成av人片无码迅雷下载| 中文国产成人久久精品小说| 视频精品亚洲一区二区| 亚洲AV午夜电影在线观看| A毛片毛片看免费|