        What to check before the soft starter is powered on?

        2023-05-20 11:27:04

        Soft starter is a novel motor control device that integrates motor soft start, soft stop, light load energy saving and multiple protection functions. It is called Soft Starter abroad. The domestic soft starter is the most famous Heping hps2 series soft starter. Its main composition is a three-phase parallel thyristor and its electronic control circuit connected in series between the power supply and the controlled motor.


        The soft starter we use needs to be powered on. Generally, we need to check before power on before use. Let's take a look with the editors below to see which ones to check:


        First, check the wiring


        1. Check whether the wiring is correctly connected in accordance with the requirements of the product instruction manual, especially pay attention not to connect the output terminals (U, V, W) to the three-phase power supply.


        2. Check whether the installation is normal and whether the grounding is correct and reliable. Especially for the control circuit wiring (such as the given signal line and feedback signal line on the input side, the frequency signal line and current signal line on the output side, the switch signal control line, etc.), it is necessary to keep away from the main circuit (more than 100mm) and shield Anti-interference measures. The shield of the cable should be connected to the common end (COM) of the control circuit near the inverter. Do not connect to the ground (PE) of the inverter. The other end of the shield should be suspended.


        3. Check whether the brake unit wiring is correct. When connecting an external braking resistor (some inverters have a built-in braking resistor, when the capacity is insufficient, an external braking resistor is required), first remove the wiring of the built-in braking resistor from the P (+) and DBd terminals, and The wire end is insulated, and then the external braking resistor is connected to P (+) and DB. It is required that the wiring length is less than 5M, and twisted pairs are used.


        4. Check whether the DC reactor wiring is correct. Note: Short-circuit conductors are connected to the connection terminals P1 and P (+) when leaving the factory. When using a DC reactor, this short-circuit conductor should be removed; if a DC reactor is not used, the short-circuit conductor can be connected at both ends of the reactor.


        2. Check AC power. For three-phase inverters, the three-phase AC power supply voltage should be within the allowable range (such as 340-440v). Overvoltage and undervoltage are strictly prohibited.


        Third, check the motor


        1. Use a 500V-1000V megohmmeter to measure the insulation resistance of the motor winding to the shell, which should not be less than 5 megohms. If the insulation resistance is less than 2 megohms or the winding has been in contact with the shell, it is strictly prohibited to use the inverter. Otherwise, the inverter will be damaged.


        2. Measure the DC resistance between the three windings of the motor, which should be balanced in three phases, and the resistance between the windings of each phase is ohms. If the resistance is too small or zero, it means that there is a short circuit in the motor winding, and it is strictly forbidden to use it.


        In general, when we check the power of the soft starter, we also need to pay attention to the above points to reduce failures due to power problems during use.


        通用變頻器


        label

        QR code

        The public,

        Mobile station
        The public, Mobile station

        Contact

        未標題-8.png 0755-81719517
        未標題-10.png0755-81719530 未標題-11.pngamb@ambition.com.cn
        未標題-12.pngFloor 1, 5 and 6, building 7, lijincheng science and technology industrial park, gongye dong road, longhua new district, shenzhen

        Navigation

        Home          About

        Product      Case

        Solution      Service

        Job      News

        Contact          

        Copyright © Shenzhen Ambition Electronic Co., Ltd Record number:備案號:粵ICP備12045920號
        主站蜘蛛池模板: 精品视频在线观自拍自拍| AV无码免费不卡在线观看| 中文午夜乱理片无码| 久久久久香蕉国产线看观看伊| 亚洲欧洲av一区二区久久 | 免费十八禁一区二区三区| 亚洲av日韩av永久无码电影| 四虎影视一区二区精品| 做暖暖视频在线看片免费| 国产又色又爽又黄的视频在线 | 天堂无码人妻精品一区二区三区| 亚洲精品无码永久在线观看| 色天使久久综合网天天| 中文字幕 日韩 人妻 无码| 国产片av在线观看国语| 亚洲国产精品第一二三区| 亚洲电影天堂在线国语对白| 久久9精品区-无套内射无码| 欧美精品在线观看视频| 欧美性色欧美a在线播放| 丰满少妇被猛烈进入无码| 无码国产精品一区二区免费3P| 欧美日韩国产高清视频在线观看| 亚洲精品无播放器在线播放| 无码中文字幕热热久久| 色花堂国产精品首页第一页 | 国内精品无码一区二区三区| 伊人久久大香线蕉成人| 亚洲国产日韩一区三区| 韩国无码AV片在线观看网站| 办公室强奷漂亮少妇视频| 中文字幕av一区二区三区| 午夜福利一区二区在线看| 激情综合网五月激情五月| 99国产欧美精品久久久蜜芽| 亚洲中文字幕一区二区| 国产AV福利第一精品| 久久精品视频一二三四区| 亚洲人成影院在线观看| 亚洲AV无码一区二区一二区色戒| 国产激情视频在线观看首页|